Projects · Division 02
Infrastructure. Selected projects.
Roads, drains and infrastructure development, built to specification and tested at every stage.

Infrastructure · Blue World City, Chakri
208-ft road
Earthwork, compaction, road formation and open drains for a 208-ft wide main road.

Infrastructure · Blue World City, Chakri
Sports Valley
Complete scope: earthwork, compaction, roads and drains.
How we build roads
Compacted in layers. Tested before the next.
Fill is placed and rolled in controlled layers. Each layer is then tested in the field by the core cutter method: a steel cylinder is driven into the compacted soil to measure its dry density, which is compared with the laboratory Proctor maximum. Only when the layer reaches the specified compaction does the next one go on.